GENERAL SYNOPSIS:

As the General Contractor of this project, CLM was given the task of re-constructing and widening 1 mile of Williamson Valley Road with 2 additional lanes. Hard rock conditions throughout made for challenges, however we were still able to complete this project 6 months ahead of schedule. This project included construction of 35,000 square feet of retaining wall, 23 catch basins, 2,500 LF of Storm Drain, 5,000LF of waterline, 1,100LF of Sewer, 2,000LF of Metal Handrailing, 24,000SF of Sidewalk, 10,000LF of Curb/Gutter, and approximately 50,000CY of Excavation. Our precision blasting team allowed us to blast areas adjacent to utilities and homes without damaging them

CLEAR & GRUB MASS GRADING
WATER LINE SEWER LINE
MANHOLES STORM DRAIN
CATCH BASINS CURB/GUTTER
SIDEWALK FINE GRADING
SUBGRADE ASPHALT
BLASTING  
FINISHED 6 MONTHS AHEAD OF SCHEDULE AND $400,000 UNDER BUDGET.